Erosion and Sediment Control Tip #110

 

On a positive note, thanks to the ponding and skimming, at least there is a LOT of sediment captured in the Sediment Basin.  However, if you are constantly fighting sediment on your construction site, look in the basin’s drainage area for erosion control solutions.  Sediment Control is the LAST Pillar of Construction Stormwater Management.  You must get the other 4 pillars right to make sediment control easy.

 

Perry L Oakes, PE

Alabama’s Erosion and Sediment Control Program Manager

Comments

Popular posts from this blog

Today’s Erosion and Sediment Control Tip: #10

Erosion and Sediment Control Tip #88

Today’s Erosion and Sediment Control Tip: #2