Erosion and Sediment Control Tip #88

 

On some construction jobs, temporary access across a stream or drainageway is needed.  Rather than taking construction equipment through the stream, it is always best to use a temporary bridge if possible, or a culvert crossing as a second option.  Always protect the aquatic environment.

 

Perry L Oakes, PE

Program Coordinator

AL Erosion and Sediment Control Program

Comments

Popular posts from this blog

Erosion and Sediment Control Tip #73

Erosion and Sediment Control Tip #75