Erosion and Sediment Control Tip #109

Image
  “What we’ve got here is a failure to communicate”. IYKYK The installers were told to wrap the ends of the Type B silt fence, and they did. Just not together. Just another reminder that Communication is the First Pillar of Construction Stormwater Management. _________________________________________________ Thanks to all the recent Clear Water Alabama Sponsors.  They helped to make this another great event.

Erosion and Sediment Control Tip #108

Image
  The inlet of flumes or chutes should be oversized to ensure the runoff stays in the concentrated flow area.  This ensures the transition from sub-critical to critical flow occurs in a protected area. The red line indicates the cross-section of what the inlet should look like.  The lack of side slopes and a pile of rock forcing the flow to one side has resulted in this rock chute needing a big repair.   Perry L Oakes, PE Alabama’s Erosion and Sediment Control Program Manager