Erosion and Sediment Control Tip #106
Many of you have heard my
presentation “It’s All About the Roots”. Here are 2 slopes that were both
shaped, tracked, and hydroseeded. The only difference between the two is
that the near slope had a few weeks for the seed to grow and roots to start
becoming established. The far slope was hydroseeded the day before a
torrential rain event. It’s All About the Roots (and timing of course).
________________________________________
Early Bird Deadline
for Clear Water Alabama Registration is August 15th.
For meeting information: https://alabamasoilandwater.gov/alesc-clearwater/
To register or become a
sponsor: https://www.alabamastormwater.org/clear-water-alabama
Perry L Oakes, PE
Alabama’s Erosion and Sediment Control Program Manager
Comments