Erosion and Sediment Control Tip #82
This is just a reminder that when sediment basins or
detention/retention basins used as a sediment basin are specified on a project,
they should be constructed and stabilized PRIOR to the commencement
of construction activities. So, install and stabilize the basin, and THEN
clear the watershed above the basin. And as always, stabilize disturbed
soil at EVERY opportunity.
Perry L Oakes, PE
Program Coordinator
AL Erosion and Sediment Control Program
Comments