Erosion and Sediment Control Tip #88
  On some construction jobs, temporary access across a stream or drainageway is needed.  Rather than taking construction equipment through the stream, it is always best to use a temporary bridge if possible, or a culvert crossing as a second option.  Always protect the aquatic environment.   Perry L Oakes, PE Program Coordinator         AL Erosion and Sediment Control Program