Erosion and Sediment Control Tip #59
Research at the Auburn Stormwater Research Facility has
found that a lot of the under-mining type failures of a silt fence are
initiated around the post. The new recommended off-set installation
eliminates this issue when installed properly. By offsetting the post 6 in.
downstream of the trench allows for the post to be inserted into undisturbed
ground. It also allows for better compaction of soil on the silt fence
geotextile when filling the trench.
Perry L
Oakes, PE
Erosion and Sediment
Control Program Coordinator
AL Soil and Water
Conservation Committee