Erosion and Sediment Control Tip #55

 

I know this is a post-construction stormwater picture of paint being emptied into a storm sewer, but I have seen chemicals like paint emptied into construction stormwater conveyance systems that run straight to our streams.  Nothing but clean runoff water (either construction or post-construction) should enter the waters of the state from our developed sites.

 ______________________________________________________________________

The Alabama Stormwater Symposium and Clear Water Alabama event is fast approaching, September 20-21, 2023, at the Marriott Shoals Convention Center.

Early Bird Rates end August 25th!!

Visit our website for meeting information and registration:

https://alabamasoilandwater.gov/alesc/

Select “Events and Training”, “Clear Water Alabama”, and “2023”

 

Perry L Oakes, PE

Erosion and Sediment Control Program Coordinator

AL Soil and Water Conservation Committee

Comments

Popular posts from this blog

Alabama Irrigation Initiative Making a Difference in the Wiregrass

Today’s Erosion and Sediment Control Tip: #16

Erosion and Sediment Control Tip #54