Erosion and Sediment Control Tip #35
Just as this picture clearly shows that a paving job is a
“Process” if done correctly, erosion and sediment control on a construction
site should be a process.
E&SC practices must be properly planned, correctly
executed (sequenced), correctly installed, adapted as needed based on site
conditions, and properly maintained for the life of the practices.
When E&SC is executed with a “Process” in mind, our soil
can be kept on-sight and our construction stormwater clean.
Perry L Oakes, PE
Erosion and Sediment Control Program Coordinator
AL Soil and Water Conservation Committee