Erosion and Sediment Control Tip #30


 

You have often heard us talk that an Erosion and Sediment Control Plan for a construction site should be “Site Specific”.  That’s because every site (even a small home site lot) is a little different from the other sites.  So designers should be careful and not use what I call “cookie cutter” plans for erosion and sediment control.  While the plans can be similar and have some of the same features, the plans should meet the requirements for the specific location. Make sure your plan is ON TARGET.

 

Perry L Oakes, PE

Erosion and Sediment Control Program Coordinator

AL Soil and Water Conservation Committee

Comments

Popular posts from this blog

Alabama Irrigation Initiative Making a Difference in the Wiregrass

Erosion and Sediment Control Tip #54

Today’s Erosion and Sediment Control Tip: #16