Erosion and Sediment Control Tip #75

Image
  If you “do it right the first time”, you shouldn’t have to repair a site.  Here is one example from the 2010 Clear Water Alabama event where the project is now over 14 years old.  Riprap outlet protection was installed at the pipe outlet to dissipate the energy of the flowing water.  The eroded channel was shaped to design dimensions, covered in TRM, infilled with topsoil, and sodded.  Other than a little vegetation management needed at the riprap outlet, the site is still pristine.     Perry L Oakes, PE Program Coordinator AL Erosion and Sediment Control Program

Erosion and Sediment Control Tip #74

Image
  Project Sites need proper planning for Construction Sequencing, Erosion and Sediment Control, and Stormwater Management.  I kind of wonder about the planning on this site?   Perry L Oakes, PE Program Coordinator AL Erosion and Sediment Control Program